How do I change revision info in Revit?

How do I change revision number in Revit?

Edit an Existing Numbering Sequence

  1. In the project, click View tab Sheet Composition panel (Sheet Issues/Revisions).
  2. In the Sheet Issues/Revisions dialog, under Customize Numbering, click Numbering.
  3. Select an existing numbering sequence from the list.
  4. In the numbering dialog, click (Edit).

How do I change revision schedule in Revit?

Modify the revision schedule properties, as follows:

  1. In the Project Browser, under Views (all) Schedules, click Revision Schedule.
  2. On the Properties palette, for Appearance, click Edit.
  3. On the Appearance tab of the Revision Properties dialog, for Height, select User defined.
  4. Click OK.

How do you edit revision clouds in Revit?

Click Modify | Revision Clouds tab Mode panel (Edit Sketch).

  1. In the project, click Manage tab Settings panel (Object Styles).
  2. Click the Annotation Objects tab.
  3. For Revision Clouds, change the values for Line Weight, Line Color, and Line Pattern.
  4. Click OK. These changes apply to all revision clouds in the project.

How do you change title block revisions in Revit?

Add a Revision Schedule to a Title Block

  1. Open a title block for editing.
  2. (Optional) In the title block, sketch a border for the revision schedule area.
  3. Click View tab Create panel (Revision Schedule).
  4. On the Fields tab of the Revision Properties dialog, add the fields to include in the schedule.
THIS IS SIGNIFICANT:  How do you reset zoom in Revit?

Why do my revision clouds disappear in Revit?

The reason that the Revit Revision Box is non editable / greyed out on the sheet is because there is a cloud or series of clouds on the sheet that are not visible. To resolve this, go to the Manage Tab → Additional Settings → Sheet Issues / Revisions.

How do I remove a revision from a sheet in Revit?

Delete Revisions

  1. Click View tab Sheet Composition panel (Sheet Issues/Revisions).
  2. Click the sequence number for the revision you wish to delete. Optionally, press and hold Ctrl, then click to select multiple sequence numbers to delete.
  3. Click Delete. …
  4. At the confirmation message, click OK. …
  5. Click OK.

How do you reduce revision cloud size in Revit?

Specifying Arc Length for Revision Clouds

  1. Click View tab Sheet Composition panel (Sheet Issues/Revisions).
  2. On the Sheet Issues/Revisions dialog, enter a value for Arc Length. (The units for this value are determined by the Length project units.)
  3. Click OK.

How do I change the revision arc length in Revit?

Specify the default arc lengths to use when creating revision clouds.

  1. Click Home tab Draw panel Revision Cloud drop-down. …
  2. In the drawing area, right-click and choose the Arc length option.
  3. Enter a new approximate chord length for the revision cloud arcs.

What controls the revision cloud arc length in Revit?

The minimum arc length for the revision cloud shape can be specified in the Arc Length option on the Sheet Issues/Revisions dialog. This setting controls the arc length for all revision clouds in the project. By default, Revit assigns to the clouds the latest revision assigned to any view on that view’s sheet.

THIS IS SIGNIFICANT:  Frequent question: What is an enlarged floor plan?

How do I change the row height in Revit?

Review the schedule after it has been placed onto a sheet, and see that the size of the rows have increased.

Alternative

  1. Go to Fields tab of the Schedule Properties.
  2. Click the Add Calculated Parameter. icon.
  3. Specify a name for the parameter.
  4. Set the Type = Text.
  5. Leave the Formula blank, and click OK.

How do I edit text in a Revit sheet?

Edit Model Text

  1. In the drawing area, select the model text.
  2. Click Modify | Generic Models tab Text panel Edit Text.
  3. In the Edit Text dialog, change the text as desired.
  4. Click OK.